Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The bill of material to be used to define the production order for the materials belonging to the Material Class (General or with table), the minimum/maximum material quantity to be produced and to calculate the standard cost for the plant is recorded in the Bill of Materials Relation tab of the Material. When the Bill of Materials Relation is established, the bill of material to be used in material production according to the time requirement is defined. This option is available only in Materials with Finished Good type.

The information recorded in the Bill of Materials Relation tab:


Bill of Materials Code: This field is used to specify the bill with which the material will be produced. Defined bills are listed and the appropriate definition is selected. If there are no defined bills, a new definition is generated using "New" option.

...

Maximum Quantity: Indicates the maximum production quantity of the bill of materials.

Anchor_Toc335067_Toc335067 Anchor_Toc335758_Toc335758 Anchor_Toc25995939_Toc25995939 Anchor_Toc26002977_Toc26002977 Anchor_Toc26090841_Toc26090841 Anchor_Toc26692409_Toc26692409 Anchor_Toc30321597_Toc30321597 Anchor_Toc56581045_Toc56581045 Anchor_Toc56583810_Toc56583810 Anchor_Toc154561094_Toc154561094The bill of materials information recorded in the Material is processed in production order entries. When the Finished Good Code and the Planned Quantity are specified in Production Order entry, the code of the finished good is displayed as default in the Bill of Materials Code field.