Page tree
Skip to end of metadata
Go to start of metadata

The report used to list standard BOM costs by levels. This option is located in the Records and Assignments List menu of the Production Definitions section. The number of levels required to be displayed is specified on the Number of Levels filter line. The filter options are as follows:

Filter

Value

Material Code

Group / Range

Material Description

Group / Range

Material Aux. Code

Group / Range

Material Authorization Code

Group / Range

Material Group Code

Group / Range

Parent Material Class Code

Group / Range

Level Count

Number of Levels entry

Period Code

Group / Range

Period Description

Group / Range

Period Start Date

Start / End

Period End Date

Start / End

Plants

Defined plants

Bill of Materials Code

Group / Range

Bill of Materials Description

Group / Range

Bill of Materials Aux. Code

Group / Range

Bill of Materials Auth. Code

Group / Range

Revision Code

Group / Range

Revision Description

Group / Range

Variant Code

Group / Range

Variant Description

Group / Range

Variant Aux. Code

Group / Range

  • No labels