Page tree
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »


The option used to actualize realization of production order operation in batch. For this operation, Realization of Production Planning Proposals option located in the Operations menu of the Planning section is used. The conditions are specified in the filter lines. The filter options are:

Filter

Value

Source of Proposal

Master Production Schedule (MPS) / Material Requirement Planning (MRP) / Capable to Promise (CTP)

Proposal Slip Date

Start / End

Proposal Slip Number

Group / Range

Proposal Slip Status

Approved / Delivering

Delivery Type

Purchase / Production Order

Slip Date

Start / End

Delivery Date

Start / End

Undelivered Quantity

Value entry

Material Code

Group / Range

Material Description

Group / Range

Material Aux. Code

Group / Range

Material Auth. Code

Group / Range

Material Group Code

Group / Range

Material Vendor Code

Group / Range

Parent Material Code

Group / Range

Material (Class) Characteristics

Characteristic – 1-10 (Characteristic Code / Characteristic Value)

Configurable Sign

Yes / No

Variant Code

Group / Range

Variant Description

Group / Range

Variant Aux. Code

Group / Range



  • No labels