Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Realization of Proposed Order window consists of two panes. Material demand information recorded on the Demand Slip is displayed on the left pane. While demand delivery information is entered to the fields of the right pane; demand delivery information is recorded separately for each line located on the Proposal Realization window.

Image Removed

Material and/or service information is displayed on separate lines on the Demand Delivery window with the following column information:

...

Conditions which are required to generate proposal order transactions are specified using the Production Planning Proposals Realization option. The filter options are:

Filter

Value

Source of Proposal

Master Production Schedule (MPS) / Material Requirements Planning (MRP) / Capable to Promise (CTP)

Proposal Slip Date

Start / End

Proposal Slip Nr.

Group / Range

Proposal Slip Status

Approved / Delivering

Delivery Type

Purchase / Production Order

Slip Date

Start / End

Delivery Date

Start / End

Undelivered Quantity

Value Entry

Material Code

Group / Range

Material Description

Group / Range

Material Aux. Code

Group / Range

Material Authorization Code

Group / Range

Material Group Code

Group / Range

Material Vendor Code

Group / Range

Parent Material Class Code

Group / Range

Material (Class) Characteristics

Characteristic 1-10 (Characteristic Code / Characteristic Values)